Webinar

The 800G Migration Reality: Scaling DWDM Networks Without Redesign

Erik Garland Duration: 60 minutes

Speaker

Erik Garland

Erik Garland,
Director of Sales PacketLight Networks

Erik Garland is Director of Sales at PacketLight Networks, driving adoption of next-generation DWDM and OTN transport solutions. With over a decade of experience in the fiber optic and wireline industry, he has worked with enterprises, carriers, and hyperscalers to design and scale high-performance optical transport networks.
Based in the San Francisco Bay Area, Erik focuses on helping organizations evolve their networks with open, modular, and scalable architectures. His work centers on enabling efficient bandwidth growth, reducing complexity, and delivering high-performance transport solutions for data center, AI, and mission-critical infrastructure.

Webinar Overview

AI has broken the old rules of capacity planning. Traffic growth used to be predictable enough to forecast three to five years out, now it’s bursty, irregular, and compressed into one to two year cycles.

In this session, PacketLight’s Erik Garland breaks down why 800G is less a speed upgrade and more an architectural and economic shift, and walks through practical, non-disruptive migration paths for brownfield DWDM networks.

Who will benefit from this webinar?

  • Network architects and planning teams scaling toward 800G without a full network redesign.
  • CTOs and executives managing capex, avoiding forklift upgrades, and planning for AI-driven traffic growth.
  • Engineering and operations teams looking for practical migration paths for existing DWDM/OTN networks.
  • System integrators and technology partners advising on optical transport upgrades for AI and DCI growth.

Key Takeaways

  • Why 800G’s value isn’t raw capacity – The real win is needing half the number of wavelengths, lower power per terabit, and higher rack density, compared with 400G.
  • Why forklift upgrades are off the table – Carriers and cloud providers “can’t justify forklift upgrades across long-haul, metro, and DCI infrastructures.”
  • Three migration paths for brownfield networks – L-band expansion, flex-grid ROADM migration, a hybrid spectrum split that transports legacy and 800G traffic separately.
  • Why planning timelines are shorter – AI’s bursty traffic between data centers and inference clusters has compressed 3-5 year capacity plans into 1-2 year cycles.
  • Supply chain is now part of network design – component shortages and hyperscaler demands are extending lead times for coherent DSPs, pluggables, and ROADMs, making vendor diversification a planning requirement, not an afterthought.
  • Coherent pluggable modules vs. IPoDWDM – a dedicated optical layer scales independently of router refresh cycles, while IPoDWDM ties your optical lifecycle to your IP lifecycle.

Download the executive summary

FAQs

Yes. Watch the full on-demand recording above, anytime.